Smart Joint Electrofusion Saddles
Electrofusion Tapping Tee
Smart Joint produce a full range of electrofusion tapping tee, with main pipes go up to 400mm, branches sizes go up to 63mm, strong, reliable, with smart joint stainless steel and brass threaded female and male adaptors, it can be connected with water/gas meter easily.
Small Electrofusion Saddle
Smart Joint developed branch size 63,90,110,125,200mm electrofusion saddle.
Customer intalled these branched on mina pipe from 110mm to 710mm.
The price is very at tractive, it's convenient to get on-site branches and even cheaper than the cost for pull-out butt fusion saddle branches in the workshop.
Full Electrofusion Saddle branch
Smart Joint produce a full range of electrofusion saddle branches, with proper clamp tools, it main pipes can go up to 1600mm, branch sizes go up to 225mm.
Full Electrofusion Saddle branch is an idea branch solution for the large size main pipes.
Full electrofusion saddle branch has the followed advantages:
A. There is no need to consider in advance about the location of branches in main PE pipe construction, without concerns on the branch location, the design of main pipe is free from restriction.
Full electrofusion saddle branch can be placed and installed easily where the branch is needed after the completion of the main pipe installation.
B. The branches part also can adopt electrofusion, which works as an electrofusion coupler and is more convenient than butt fusion and saves time, no need to move the heavy butt fusion machine everywhere.
It helps to reduce the cost for both fittings and construction.Compare to traditional fabricated tee, or injected reducing tee with reducers fabricated,smart joint full electrofusion saddle solution is easier and much cheaper.
Most of the large size HDPE pipe project require outlet for diffusion.
How to solve HDPE branches instead of traditional saddle butt fusion or fabricated equal tee with reducer?
Smart Joint on-site installation of Electrofusion Saddles Branches from 32mm to 630mm amounted to main pipe up to 1600mm can solve this problem easily.